3 Liquified natural gas facilities

3  Liquified natural gas facilities

(1)     The construction of an LNG facility in Wales or the Welsh marine area is a significant infrastructure project if—

(a)     the storage capacity of the facility is expected to be at least 43 million standard cubic metres, or

(b)     the maximum flow rate of the facility is expected to be at least 4.5 million

Powered by Lexis+®